Project Details
This page displays current information for project DEA: 07309304.
Project Information
Project Identifiers | Project ID: 214620 DEA: 07309304 EFIS: 0714000281 |
---|---|
DIST-CO-RTE-PM | 07-LA-210,405,605-Various |
Award Date | 03/18/2020 |
Closeout Date | 07/26/2022 |
Work Description | REINFORCE STRUCTURAL CONCRETE BRIDGE AND PLACE RHMA SHOULDER PAVING. |
Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 04/15/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
moe.izadpanah@dot.ca.gov | MOHAMMAD IZADPANAH | Resident Engineer | Caltrans RE DB |
richard.joludow@dot.ca.gov | Richard Joludow | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 33 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-01-06-47 | 01/06/2022 | 01/18/2022 | Per Request | Asphalt Rubber Binder | View |
2022-01-12-5 | 01/12/2022 | 01/12/2022 | Department Acceptance | Soil | View |
2022-01-12-22 | 01/12/2022 | 01/12/2022 | Department Acceptance | Soil | View |
2022-01-03-4 | 01/03/2022 | 01/05/2022 | Verification | Aggregate | View |
2022-01-03-5 | 01/03/2022 | 01/05/2022 | Per Request | Asphalt Binder | View |
2021-12-28-5 | 12/28/2021 | 01/03/2022 | Department Acceptance | Hot Mix Asphalt | View |
2021-11-30-5 | 11/30/2021 | 11/30/2021 | Department Acceptance | Soil | View |
2021-11-30-7 | 11/30/2021 | 11/30/2021 | Department Acceptance | Soil | View |
2021-11-30-20 | 11/30/2021 | 11/30/2021 | Department Acceptance | Soil | View |
2021-11-30-21 | 11/30/2021 | 11/30/2021 | Department Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods