Project Details
This page displays current information for project DEA: 041J5694.
Project Information
Project Identifiers | Project ID: 214601 DEA: 041J5694 EFIS: 0419000313 |
---|---|
DIST-CO-RTE-PM | 04-SM-101-0.0/21.8 |
Award Date | 12/03/2019 |
Closeout Date | 09/28/2022 |
Work Description | San Mateo US 101 Express Lanes North |
Location Description | Not set |
QA Service Level | 1 (Verified on 04/08/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
douglas.inori@dot.ca.gov | Douglas Inori | Resident Engineer | Caltrans RE DB |
tyler.pinell@dot.ca.gov | Tyler Pinell | Structural Representative | Caltrans SR DB |
christopher.m.mcdermott@dot.ca.gov | Christopher McDermott | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 271-277 of 277 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-05-26-20 | 05/26/2020 | 05/26/2020 | Quality Control | Concrete | View |
2020-05-26-16 | 05/26/2020 | 06/05/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-05-26-15 | 05/26/2020 | 06/05/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-05-22-15 | 05/22/2020 | 05/22/2020 | Quality Control | Concrete | View |
2020-05-20-40 | 05/20/2020 | 05/26/2020 | Quality Control | Concrete | View |
2020-04-27-13 | 04/27/2020 | 05/01/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-04-13-5 | 04/13/2020 | 04/22/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-1 of 1 result.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
JMF3511-318-2021-100 | Submittal Accepted for Verification | CT D04 - Hayward DME / District Laboratory | 10/14/2021 | View |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods