Project Details

This page displays current information for project DEA: 041J5694.

Project Information

Project IdentifiersProject ID: 214601
DEA: 041J5694
EFIS: 0419000313
DIST-CO-RTE-PM04-SM-101-0.0/21.8
Award DateNot set
Closeout DateNot set
Work DescriptionBarrier modifications, overhead signs, freeway lighting and electronic toll system components
Location DescriptionSANTA CLARA AND SAN MATEO COUNTIES FROM 0.3 MILE NORTH OF SAN ANTONIO ROAD TO 0.3 MILE SOUTH OF GRAND AVENUE INTERCHANGE
QA Service Level1 (Verified on 02/21/2020)

Samples

Samples submitted for this project.
Displaying 1-10 of 261 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2021-08-19-608/19/202108/24/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-06-11-1906/11/202106/17/2021Quality AssuranceConcreteView
2021-05-12-2405/12/202105/25/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-05-12-2505/12/202105/25/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-05-12-2605/12/202105/25/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-05-12-2705/12/202105/25/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-05-12-2805/12/202105/25/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-05-12-2905/12/202105/25/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-05-12-3005/12/202105/25/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-05-12-3105/12/202105/25/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView

Job Mix Formula (JMF)

JMFs associated with this project.
JMF IDStatusSubmitted byDIME Sample IDDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs submitted for this project.
Declaration NumberProgram OperatorMaterial TypeVendorSubmitted by
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods