Project Details
This page displays current information for project DEA: 07353404.
Project Information
Project Identifiers | Project ID: 214568 DEA: 07353404 EFIS: 0718000289 Permit Numbers: 0719ADP1912 |
---|---|
DIST-CO-RTE-PM | 07-LA-72-5.243/5.3 |
Award Date | 02/28/2019 |
Closeout Date | Not set |
Work Description | Addition of East bound and west bound through lane , east bound right turn lane and second west bound left turn lane at Philadelphia st, bike lane, new bus stop, modification to signal phasing and temporary traffic controls |
Location Description | City of Whittier , Whitter Blvd, State Hwy 72, 0.1 mile North West of Sorensen Ave to 0.2 mile south east of Philadelphia St. |
QA Service Level | NOT VERIFIED |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods