Project Details
This page displays current information for project DEA: 081H2904.
Project Information
Project Identifiers | Project ID: 214549 DEA: 081H2904 EFIS: 0817000006 |
---|---|
DIST-CO-RTE-PM | 08-SBD-173-18.7 |
Award Date | 08/20/2020 |
Closeout Date | 10/02/2024 |
Work Description | STRUCTURAL CONCRETE SOIL NAIL WALL AND SOLDIER PILE WALL. |
Location Description | SAN BERNARDINO COUNTY NEAR CEDAR GLEN AT 0.1 MILE SOUTH OF HOSPITAL ROAD |
QA Service Level | 1 (Verified on 01/13/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
elvira.lenart@dot.ca.gov | Elvira Lenart | Resident Engineer | Caltrans RE DB |
ravinder.s.gill@dot.ca.gov | Ravinder Singh | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 31 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-03-21-8 | 03/21/2023 | 04/06/2023 | Verification | Aggregate | View |
2023-03-21-9 | 03/21/2023 | 04/06/2023 | Verification | Asphalt Binder | View |
2023-05-15-57 | 05/15/2023 | 05/18/2023 | Verification | Aggregate | View |
2023-12-06-6 | 12/06/2023 | 12/07/2023 | Verification | Asphalt Binder | View |
2023-12-06-7 | 12/06/2023 | 12/07/2023 | Verification | Aggregate | View |
2021-07-08-3 | 07/08/2021 | 07/13/2021 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2021-10-05-2 | 10/05/2021 | 10/12/2021 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2021-09-21-56 | 09/21/2021 | 09/20/2021 | Quality Assurance | Aggregate | View |
2022-01-25-22 | 01/25/2022 | 01/25/2022 | Quality Assurance | Aggregate | View |
2022-02-04-15 | 02/04/2022 | 02/04/2022 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods