Project Details
This page displays current information for project DEA: 021H3904.
Project Information
Project Identifiers | Project ID: 214513 DEA: 021H3904 EFIS: 0216000041 |
---|---|
DIST-CO-RTE-PM | 02-SHA-5-R32.0/R32.3 |
Award Date | 01/24/2020 |
Closeout Date | 09/28/2021 |
Work Description | O'BRIEN DECK AND RAIL REHAB: WEATHER INFO SYSTEM, STRUCTURAL CONCRETE, HMA, REMOVE BRIDGE BARRIER. |
Location Description | SHASTA COUNTY ABOUT 10 MILES SOUTH OF LAKEHEAD FROM 0.1 MILE SOUTH TO 0.3 MILE NORTH OF O'BRIEN UNDERCROSSING |
QA Service Level | 1 (Verified on 01/22/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
nathan.alexander@dot.ca.gov | Nathan Alexander | Resident Engineer | Caltrans RE DB |
george.moore@dot.ca.gov | George Moore | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-7 of 7 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-06-02-27 | 06/02/2020 | 06/02/2020 | Verification | Aggregate | View |
2020-06-02-28 | 06/02/2020 | 06/02/2020 | Verification | Aggregate | View |
2020-06-02-29 | 06/02/2020 | 06/02/2020 | Verification | Aggregate | View |
2020-06-02-30 | 06/02/2020 | 06/02/2020 | Verification | Aggregate | View |
2020-06-02-31 | 06/02/2020 | 06/02/2020 | Verification | Aggregate | View |
2020-06-02-32 | 06/02/2020 | 06/02/2020 | Verification | Reclaimed Asphalt Pavement | View |
2020-06-02-33 | 06/02/2020 | 06/02/2020 | Verification | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-1 of 1 result.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
JMF3511-22-2020-251 | Submittal Authorized For Use | CT D02 - Redding Northern Regional Laboratory | 07/31/2020 | View |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods