Project Details
This page displays current information for project DEA: 07311704.
Project Information
Project Identifiers | Project ID: 214493 DEA: 07311704 EFIS: 0715000013 |
---|---|
DIST-CO-RTE-PM | 07-LA-134-0.0/R13.3 |
Award Date | 04/16/2020 |
Closeout Date | Not set |
Work Description | CONCRETE SLAB REPLACEMENT, HMA PAVING, ELECTRICAL AND LANDSCAPE WORK. |
Location Description | LOS ANGELES COUNTY IN LOS ANGELES, BURBANK, GLENDALE AND PASADENA FROM ROUTE 101/134 SEPARATION TO JUNCTION OF ROUTE 210/710 |
QA Service Level | 1 (Verified on 04/15/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
david.ayalavanegas@dot.ca.gov | David Ayala Vanegas | Resident Engineer | Caltrans RE DB |
julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 61-70 of 130 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-09-13-38 | 09/13/2022 | 09/14/2022 | Department Acceptance | Aggregate | View |
2022-09-12-33 | 09/12/2022 | 09/14/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-09-12-54 | 09/12/2022 | 10/14/2022 | Department Acceptance | Aggregate | View |
2022-09-08-41 | 09/08/2022 | 09/14/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-09-08-66 | 09/08/2022 | 09/14/2022 | Department Acceptance | Aggregate | View |
2022-09-07-32 | 09/07/2022 | 09/08/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-09-07-75 | 09/07/2022 | 09/08/2022 | Department Acceptance | Aggregate | View |
2022-08-29-24 | 08/29/2022 | 08/31/2022 | Verification | Aggregate | View |
2022-08-29-40 | 08/29/2022 | 08/31/2022 | Per Request | Asphalt Binder | View |
2022-07-17-7 | 07/17/2022 | 07/17/2022 | Department Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods