Project Details
This page displays current information for project DEA: 080K1224.
Project Information
Project Identifiers | Project ID: 214486 DEA: 080K1224 EFIS: 0815000244 |
---|---|
DIST-CO-RTE-PM | 08-SBD-15-R28.6/37.5 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | REHBILIATATE EXISTING MAINLINE AND RAMP PAVEMENT |
Location Description | SAN BERNARDINO COUNTY IN HESPERIA AND VICTORVILLE FROM OAK HILL ROAD OVERCROSSING TO 0.1 MILE SOUTH OF BEAR VALLEY ROAD OVERCROSSING |
QA Service Level | 1 (Verified on 06/23/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Larry.Canuti@dot.ca.gov | Larry J Canuti | Resident Engineer | Caltrans RE DB |
taghreed.al-khateeb@dot.ca.gov | Taghreed Al-khateeb | Structural Representative | Caltrans SR DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 1041 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-11-19-2 | 11/19/2022 | 11/21/2022 | Quality Assurance | Aggregate | View |
2022-11-21-21 | 11/21/2022 | 11/22/2022 | Quality Assurance | Aggregate | View |
2022-11-22-17 | 11/22/2022 | 11/23/2022 | Quality Assurance | Aggregate | View |
2022-11-30-822 | 11/30/2022 | 12/01/2022 | Quality Assurance | Aggregate | View |
2023-02-04-7 | 02/04/2023 | 02/06/2023 | Quality Assurance | Aggregate | View |
2023-02-09-29 | 02/09/2023 | 02/10/2023 | Quality Assurance | Aggregate | View |
2023-03-17-34 | 03/17/2023 | 03/18/2023 | Quality Assurance | Aggregate | View |
2023-03-16-15 | 03/16/2023 | 03/17/2023 | Quality Assurance | Aggregate | View |
2023-04-10-33 | 04/10/2023 | 04/10/2023 | Quality Assurance | Aggregate | View |
2023-04-11-31 | 04/11/2023 | 04/12/2023 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-1 of 1 result.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
JMF3511-26-2022-6 | Submittal Accepted for Verification | CT D08 - Fontana Southern Regional Laboratory | 04/04/2022 | View |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods