Project Details
This page displays current information for project DEA: 081E5704.
Project Information
Project Identifiers | Project ID: 214465 DEA: 081E5704 EFIS: 0814000051 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10-27.7 |
Award Date | 12/26/2019 |
Closeout Date | 09/15/2021 |
Work Description | PLACE CIDH PILING AND ROCK SLOPE PROTECTION |
Location Description | RIVERSIDE COUNTY NEAR PALM SPRINGS AT WHITEWATER RIVER BRIDGE |
QA Service Level | 1 (Verified on 02/28/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
shukri.abouazra@dot.ca.gov | Shukri Abouazra | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 46 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-11-13-6 | 11/13/2020 | 11/16/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2020-11-09-1 | 11/09/2020 | 11/09/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2020-11-09-2 | 11/09/2020 | 11/09/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2020-11-09-3 | 11/09/2020 | 11/09/2020 | Quality Control | SMTL TM5 - Welded Hoops | View |
2020-10-26-9 | 10/26/2020 | 10/27/2020 | Quality Assurance | Concrete | View |
2020-10-21-23 | 10/21/2020 | 10/22/2020 | Quality Assurance | Concrete | View |
2020-10-05-1 | 10/05/2020 | 10/07/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2020-10-05-2 | 10/05/2020 | 10/07/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2020-10-06-23 | 10/06/2020 | 10/07/2020 | Quality Assurance | Concrete | View |
2020-09-30-5 | 09/30/2020 | 10/05/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods