Project Details
This page displays current information for project DEA: 030J8404.
Project Information
Project Identifiers | Project ID: 214456 DEA: 030J8404 EFIS: 0320000032 |
---|---|
DIST-CO-RTE-PM | 03-BUT-70-16.6, 16.63 |
Award Date | 08/23/2019 |
Closeout Date | 04/23/2021 |
Work Description | Emergency Repair - High Speed Vehicle Strike |
Location Description | Garden Drive O.C |
QA Service Level | 1 (Verified on 10/03/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
glen.lawson@dot.ca.gov | glen Lawson | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-4 of 4 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-09-27-10 | 09/27/2019 | 09/30/2019 | Quality Assurance | Concrete | View |
2019-09-27-9 | 09/27/2019 | 09/30/2019 | Quality Assurance | Concrete | View |
2019-09-27-8 | 09/27/2019 | 09/30/2019 | Quality Assurance | Concrete | View |
2019-09-27-7 | 09/27/2019 | 09/30/2019 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods