Project Details
This page displays current information for project DEA: 07303704.
Project Information
Project Identifiers | Project ID: 214451 DEA: 07303704 EFIS: 0714000035 |
---|---|
DIST-CO-RTE-PM | 07-LA-101-8.0/27.3 |
Award Date | 12/19/2019 |
Closeout Date | 05/07/2024 |
Work Description | REPLACE CONCRETE BARRIERS. |
Location Description | THE CITY AND COUNTY OF LOS ANGELES FROM PILGRIMAGE OVERCROSSING TO VALLEY CIRCLE BOULEVARD OVERCROSSING |
QA Service Level | 1 (Verified on 08/12/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
kevin.bui@dot.ca.gov | Kevin Bui | Resident Engineer | Caltrans RE DB |
kwangsuk.suh@dot.ca.gov | Kwangsuk Suh | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 245 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-03-21-38 | 03/21/2022 | 04/01/2022 | Verification | Aggregate | View |
2022-03-21-48 | 03/21/2022 | 03/23/2022 | Acceptance | Hot Mix Asphalt | View |
2022-03-21-49 | 03/21/2022 | 04/01/2022 | Per Request | Asphalt Binder | View |
2022-03-22-6 | 03/22/2022 | 03/22/2022 | Acceptance | Hot Mix Asphalt | View |
2022-03-23-1 | 03/23/2022 | 03/23/2022 | Acceptance | Soil | View |
2022-03-25-3 | 03/25/2022 | 03/25/2022 | Acceptance | Soil | View |
2022-04-04-26 | 04/04/2022 | 04/06/2022 | Acceptance | Aggregate | View |
2022-04-07-7 | 04/07/2022 | 04/07/2022 | Acceptance | Soil | View |
2022-04-07-8 | 04/07/2022 | 04/08/2022 | Acceptance | Concrete | View |
2022-04-08-5 | 04/08/2022 | 04/08/2022 | Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods