Project Details
This page displays current information for project DEA: 030H3414.
Project Information
Project Identifiers | Project ID: 214449 DEA: 030H3414 EFIS: 0317000152 |
---|---|
DIST-CO-RTE-PM | 03-ED-50-R28.5/R29.1,R31.2 |
Award Date | 12/09/2019 |
Closeout Date | 07/06/2021 |
Work Description | REPLACE BRIDGE, RESTORE CULVERTS, AND ADD HIGHWAY PLANTING. |
Location Description | EL DORADO COUNTY NEAR POLLOCK PINES FROM 0.3 MILE WEST TO 0.3 MILE EAST OF RIDGEWAY DRIVE UNDERCROSSING AND AT 0.1 MILE WEST OF SLY PARK ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 10/23/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jody.phillips@dot.ca.gov | Jody Phillips | Resident Engineer | Caltrans RE DB |
joe.harline@dot.ca.gov | Joe Harline | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 47 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-04-14-8 | 04/14/2020 | 04/15/2020 | Department Acceptance | SMTL TM7 - Epoxy Coated Rebar | View |
2020-05-06-6 | 05/06/2020 | 05/07/2020 | Quality Assurance | Concrete | View |
2020-05-06-7 | 05/06/2020 | 05/07/2020 | Quality Assurance | Concrete | View |
2020-05-07-4 | 05/07/2020 | 05/08/2020 | Quality Assurance | Concrete | View |
2020-05-07-5 | 05/07/2020 | 05/08/2020 | Quality Assurance | Concrete | View |
2020-05-22-1 | 05/22/2020 | 05/22/2020 | Quality Assurance | Concrete | View |
2020-05-22-2 | 05/22/2020 | 05/22/2020 | Quality Assurance | Concrete | View |
2020-05-29-7 | 05/29/2020 | 05/29/2020 | Quality Assurance | Concrete | View |
2020-05-29-8 | 05/29/2020 | 05/29/2020 | Quality Assurance | Concrete | View |
2020-06-18-5 | 06/18/2020 | 06/22/2020 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods