Project Details
This page displays current information for project DEA: 040J6424.
Project Information
Project Identifiers | Project ID: 214422 DEA: 040J6424 EFIS: 0414000476 |
---|---|
DIST-CO-RTE-PM | 04-SON-101-32.8/R54.2 |
Award Date | 12/24/2019 |
Closeout Date | Not set |
Work Description | CRACK, SEAT AND OVERLAY WITH RHMA AND HMA, AND REPLACE CULVERTS. |
Location Description | SONOMA COUNTY AT VARIOUS LOCATIONS FROM LIMERICK LANE OVERCROSSING TO ROUTE 101/128 SEPARATION |
QA Service Level | 1 (Verified on 09/23/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jonathan.chi@dot.ca.gov | Jonathan Chi | Structural Representative | Caltrans SR DB |
waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 81-90 of 136 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-04-05-1 | 04/05/2021 | 04/05/2021 | Quality Control | Concrete | View |
2021-04-02-6 | 04/02/2021 | 04/02/2021 | Quality Control | Concrete | View |
2021-04-01-8 | 04/01/2021 | 04/01/2021 | Quality Control | Concrete | View |
2021-03-31-1 | 03/31/2021 | 03/31/2021 | Quality Control | Concrete | View |
2021-03-29-2 | 03/29/2021 | 03/29/2021 | Quality Control | Concrete | View |
2021-03-24-6 | 03/24/2021 | 03/24/2021 | Quality Control | Concrete | View |
2021-03-22-16 | 03/22/2021 | 03/22/2021 | Quality Control | Concrete | View |
2021-03-19-10 | 03/19/2021 | 03/19/2021 | Quality Control | Concrete | View |
2021-03-17-11 | 03/17/2021 | 03/17/2021 | Quality Control | Concrete | View |
2021-03-11-1 | 03/11/2021 | 03/11/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods