Project Details
This page displays current information for project DEA: 040J6424.
Project Information
Project Identifiers | Project ID: 214422 DEA: 040J6424 EFIS: 0414000476 |
---|---|
DIST-CO-RTE-PM | 04-SON-101-32.8/R54.2 |
Award Date | 12/24/2019 |
Closeout Date | Not set |
Work Description | CRACK, SEAT AND OVERLAY WITH RHMA AND HMA, AND REPLACE CULVERTS. |
Location Description | SONOMA COUNTY AT VARIOUS LOCATIONS FROM LIMERICK LANE OVERCROSSING TO ROUTE 101/128 SEPARATION |
QA Service Level | 1 (Verified on 09/23/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jonathan.chi@dot.ca.gov | Jonathan Chi | Structural Representative | Caltrans SR DB |
waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 71-80 of 136 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-04-30-4 | 04/30/2021 | 04/30/2021 | Quality Control | Concrete | View |
2021-05-01-1 | 05/01/2021 | 05/01/2021 | Quality Control | Concrete | View |
2021-05-03-5 | 05/03/2021 | 05/03/2021 | Quality Control | Concrete | View |
2021-05-04-4 | 05/04/2021 | 05/04/2021 | Quality Control | Concrete | View |
2021-05-05-11 | 05/05/2021 | 05/05/2021 | Quality Control | Concrete | View |
2021-05-06-3 | 05/06/2021 | 05/06/2021 | Quality Control | Concrete | View |
2021-05-10-7 | 05/10/2021 | 05/10/2021 | Quality Control | Concrete | View |
2021-05-11-9 | 05/11/2021 | 05/11/2021 | Quality Control | Concrete | View |
2021-05-13-15 | 05/13/2021 | 05/13/2021 | Quality Control | Concrete | View |
2021-05-14-5 | 05/14/2021 | 05/14/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods