Project Details
This page displays current information for project DEA: 120K0214.
Project Information
Project Identifiers | Project ID: 214355 DEA: 120K0214 EFIS: 1214000096 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5-12.4/14.5 |
Award Date | 12/20/2019 |
Closeout Date | Not set |
Work Description | South County Improvement Project (Phase 1 - Avery/Crown Valley) PLACE HMA, INSTALL CONC PAVEMENT, RETAIN WALL, MODIFY ELECT SYS. | Add one lane btwn 73 & Oso PKWY |
Location Description | ORANGE COUNTY IN SAN JUAN CAPISTRANO, LAGUNA HILLS, LAGUNA NIGUEL AND MISSION VIEJO FROM 0.5 MILE SOUTH OF AVERY PARKWAY UNDERCROSSING TO 0.8 MILE NORTH OF CROWN VALLEY PARKWAY OVERCROSSING |
QA Service Level | 1 (Verified on 10/31/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
artin.merati@dot.ca.gov | Artin Merati | Resident Engineer | Caltrans RE DB |
imad.karam@dot.ca.gov | Imad Karam | Structural Representative | Caltrans SR DB |
keivan.hassan@dot.ca.gov | Keivan Hassan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 421-426 of 426 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-04-04-60 | 04/04/2024 | 04/05/2024 | Quality Control | Concrete | View |
2024-04-19-25 | 04/19/2024 | 04/19/2024 | Quality Control | Aggregate | View |
2024-04-19-56 | 04/19/2024 | 04/20/2024 | Quality Control | Concrete | View |
2024-06-03-90 | 06/03/2024 | 06/04/2024 | Quality Control | Concrete | View |
2024-06-20-143 | 06/20/2024 | 06/20/2024 | Quality Control | Aggregate | View |
2024-06-20-162 | 06/20/2024 | 06/21/2024 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods