Project Details

This page displays current information for project DEA: 120K0214.

Project Information

Project IdentifiersProject ID: 214355
DEA: 120K0214
EFIS: 1214000096
DIST-CO-RTE-PM12-ORA-5-12.4/14.5
Award Date12/20/2019
Closeout DateNot set
Work DescriptionSouth County Improvement Project (Phase 1 - Avery/Crown Valley) PLACE HMA, INSTALL CONC PAVEMENT, RETAIN WALL, MODIFY ELECT SYS. | Add one lane btwn 73 & Oso PKWY
Location DescriptionORANGE COUNTY IN SAN JUAN CAPISTRANO, LAGUNA HILLS, LAGUNA NIGUEL AND MISSION VIEJO FROM 0.5 MILE SOUTH OF AVERY PARKWAY UNDERCROSSING TO 0.8 MILE NORTH OF CROWN VALLEY PARKWAY OVERCROSSING
QA Service Level1 (Verified on 10/31/2019)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
artin.merati@dot.ca.govArtin MeratiResident EngineerCaltrans RE DB
imad.karam@dot.ca.govImad KaramStructural RepresentativeCaltrans SR DB
keivan.hassan@dot.ca.govKeivan HassanMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 161-170 of 426 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2021-05-25-4305/25/202105/26/2021Quality ControlConcreteView
2021-05-21-3605/21/202105/22/2021Quality ControlConcreteView
2021-05-20-3505/20/202105/21/2021Quality ControlConcreteView
2021-05-17-4905/17/202105/18/2021Quality ControlConcreteView
2021-05-13-4305/13/202105/14/2021Quality ControlConcreteView
2021-05-12-6505/12/202105/13/2021Quality ControlConcreteView
2021-05-11-3905/11/202105/12/2021Quality ControlConcreteView
2021-05-10-3405/10/202105/11/2021Quality ControlConcreteView
2021-05-07-2805/07/202105/08/2021Quality ControlConcreteView
2021-05-06-3105/06/202105/07/2021Quality ControlConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods