Project Details
This page displays current information for project DEA: 07310804.
Project Information
Project Identifiers | Project ID: 214350 DEA: 07310804 EFIS: 0715000007 |
---|---|
DIST-CO-RTE-PM | 07-LA-14-R24.8/R31.4 |
Award Date | 11/05/2019 |
Closeout Date | 09/29/2020 |
Work Description | PAVE GORES, CONST MAINTENANCE VEHICLE PULLOUT AND VEGETATION CONTROL. |
Location Description | LOS ANGELES COUNTY IN AND NEAR SANTA CLARITA FROM I-5/14 INTERCHANGE TO CANYON PARK BOULEVARD UNDERCROSSING |
QA Service Level | 1 (Verified on 06/16/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ridwan.salman@dot.ca.gov | Salman Ridwan | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods