Project Details
This page displays current information for project DEA: 081F9904.
Project Information
Project Identifiers | Project ID: 214342 DEA: 081F9904 EFIS: 0815000095 |
---|---|
DIST-CO-RTE-PM | 08-SBD-15-40.1/40.5 |
Award Date | 06/15/2020 |
Closeout Date | 08/02/2021 |
Work Description | LENGTHEN ACCELERATION LANE |
Location Description | VICTORVILLE FROM 0.5 MILE TO 0.1 MILE SOUTH OF PALMDALE ROAD OVERCROSSING |
QA Service Level | 1 (Verified on 10/06/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
Displaying 1-4 of 4 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-06-27-30 | 06/27/2019 | 07/15/2019 | Informational | Soil | View |
2019-06-27-31 | 06/27/2019 | 07/15/2019 | Informational | Soil | View |
2021-03-08-1 | 03/08/2021 | 03/12/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2021-03-08-2 | 03/08/2021 | Quality Control | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods