Project Details
This page displays current information for project DEA: 081J2004.
Project Information
Project Identifiers | Project ID: 214341 DEA: 081J2004 EFIS: 0817000237 |
---|---|
DIST-CO-RTE-PM | 08-SBD-15-R21.5/R22.0 |
Award Date | 11/16/2021 |
Closeout Date | 10/02/2024 |
Work Description | EXTEND DECELARATION LANE |
Location Description | SAN BERNARDINO COUNTY NEAR HESPERIA FROM 0.1 MILE NORTH OF ROUTE 15/138 SEPARATION TO GISH OVERHEAD |
QA Service Level | 1 (Verified on 06/23/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
shaun.loza@dot.ca.gov | Shaun Loza | Resident Engineer | Caltrans RE DB |
ravinder.s.gill@dot.ca.gov | Ravinder Singh | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 46 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-03-07-37 | 03/07/2023 | 03/08/2023 | Quality Assurance | Concrete | View |
2023-03-07-36 | 03/07/2023 | 03/08/2023 | Quality Assurance | Concrete | View |
2023-03-06-37 | 03/06/2023 | 03/07/2023 | Quality Assurance | Concrete | View |
2023-03-06-36 | 03/06/2023 | 03/07/2023 | Quality Assurance | Concrete | View |
2023-03-02-42 | 03/02/2023 | 03/03/2023 | Quality Assurance | Concrete | View |
2023-03-02-41 | 03/02/2023 | 03/03/2023 | Quality Assurance | Concrete | View |
2023-02-17-44 | 02/17/2023 | 02/18/2023 | Quality Assurance | Concrete | View |
2023-02-17-43 | 02/17/2023 | 02/18/2023 | Quality Assurance | Concrete | View |
2023-03-07-28 | 03/07/2023 | 03/08/2023 | Quality Assurance | Concrete | View |
2023-03-07-27 | 03/07/2023 | 03/08/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods