Project Details
This page displays current information for project DEA: 081G2914.
Project Information
Project Identifiers | Project ID: 214340 DEA: 081G2914 EFIS: 0818000114 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-27.9 |
Award Date | 05/22/2020 |
Closeout Date | 11/01/2021 |
Work Description | WIDEN EB OFF RAMP |
Location Description | SAN BERNARDINO COUNTY IN REDLANDS AT CALIFORNIA STREET EASTBOUND EXIT RAMP |
QA Service Level | 1 (Verified on 07/16/2020) |
Samples
Samples submitted for this project.
Displaying 1-7 of 7 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-03-09-21 | 03/09/2021 | 03/10/2021 | Acceptance | Concrete | View |
2021-03-09-22 | 03/09/2021 | 03/10/2021 | Acceptance | Concrete | View |
2021-03-06-5 | 03/06/2021 | 03/07/2021 | Acceptance | Concrete | View |
2021-01-13-18 | 01/13/2021 | 01/19/2021 | Verification | Aggregate | View |
2020-11-13-8 | 11/13/2020 | 11/16/2020 | Verification | Aggregate | View |
2019-05-02-19 | 05/02/2019 | 05/02/2019 | Per Request | Soil | View |
2019-05-02-20 | 05/02/2019 | 05/02/2019 | Per Request | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs submitted for this project.
Declaration Number | Program Operator | Material Type | Vendor | Submitted by |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods