Project Details
This page displays current information for project DEA: 081G0004.
Project Information
Project Identifiers | Project ID: 214339 DEA: 081G0004 EFIS: 0815000107 |
---|---|
DIST-CO-RTE-PM | 08-RIV-95-14.5/35.6 |
Award Date | 11/04/2020 |
Closeout Date | 03/01/2022 |
Work Description | CONSTRUCT CONCRETE/RSP APRONS |
Location Description | RIVERSIDE COUNTY AT VARIOUS LOCATIONS FROM 4 MILES NORTH OF PALO VERDE DAM ROAD TO 0.6 MILE SOUTH OF SAN BERNARDINO COUNTY LINE |
QA Service Level | 1 (Verified on 12/02/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
hien.vu@dot.ca.gov | Peter Koury | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 49 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-04-15-25 | 04/15/2021 | 04/16/2021 | Quality Control | Concrete | View |
2021-04-14-30 | 04/14/2021 | 04/15/2021 | Quality Control | Concrete | View |
2021-04-13-32 | 04/13/2021 | 04/14/2021 | Quality Control | Concrete | View |
2021-04-12-61 | 04/12/2021 | 04/13/2021 | Quality Control | Concrete | View |
2021-04-09-33 | 04/09/2021 | 04/12/2021 | Quality Control | Concrete | View |
2021-04-08-5 | 04/08/2021 | 04/09/2021 | Quality Assurance | Aggregate | View |
2021-04-08-48 | 04/08/2021 | 04/09/2021 | Quality Control | Concrete | View |
2021-03-18-3 | 03/18/2021 | 03/19/2021 | Verification | Aggregate | View |
2019-06-27-20 | 06/27/2019 | 06/28/2019 | Preliminary | Soil | View |
2019-06-27-21 | 06/27/2019 | 06/28/2019 | Preliminary | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods