Project Details
This page displays current information for project DEA: 081G0004.
Project Information
Project Identifiers | Project ID: 214339 DEA: 081G0004 EFIS: 0815000107 |
---|---|
DIST-CO-RTE-PM | 08-RIV-95-14.5/35.6 |
Award Date | 11/04/2020 |
Closeout Date | 03/01/2022 |
Work Description | CONSTRUCT CONCRETE/RSP APRONS |
Location Description | RIVERSIDE COUNTY AT VARIOUS LOCATIONS FROM 4 MILES NORTH OF PALO VERDE DAM ROAD TO 0.6 MILE SOUTH OF SAN BERNARDINO COUNTY LINE |
QA Service Level | 1 (Verified on 12/02/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
hien.vu@dot.ca.gov | Peter Koury | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 49 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-04-16-44 | 04/16/2021 | 04/17/2021 | Quality Control | Concrete | View |
2021-04-17-5 | 04/17/2021 | 04/19/2021 | Quality Control | Concrete | View |
2021-04-19-36 | 04/19/2021 | 04/20/2021 | Quality Control | Concrete | View |
2021-04-20-29 | 04/20/2021 | 04/21/2021 | Quality Control | Concrete | View |
2021-04-21-29 | 04/21/2021 | 04/22/2021 | Quality Control | Concrete | View |
2021-04-22-37 | 04/22/2021 | 04/23/2021 | Quality Control | Concrete | View |
2021-04-23-19 | 04/23/2021 | 04/24/2021 | Quality Control | Concrete | View |
2021-04-24-4 | 04/24/2021 | 04/26/2021 | Quality Control | Concrete | View |
2021-04-26-26 | 04/26/2021 | 04/27/2021 | Quality Control | Concrete | View |
2021-04-27-29 | 04/27/2021 | 04/28/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods