Project Details
This page displays current information for project DEA: 080G7904.
Project Information
Project Identifiers | Project ID: 214338 DEA: 080G7904 EFIS: 0814000176 |
---|---|
DIST-CO-RTE-PM | 08-SBD,RIV-71-R0.0/R8.5,R0.0/G3.0 |
Award Date | 10/08/2020 |
Closeout Date | 11/01/2023 |
Work Description | INSTALL RMS,CCTV,CMS,VDS & FIBER OPTIC COMM SYSTEM (PSR ONLY |
Location Description | SAN BERNARDINO AND RIVERSIDE COUNTIES IN AND NEAR CHINO AND CHINO HILLS FROM LOS ANGELES COUNTY LINE TO ROUTE 91 |
QA Service Level | 1 (Verified on 06/23/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
manuel.ruiz@dot.ca.gov | Manuel Ruiz | Resident Engineer | Caltrans RE DB |
arnel.vega@dot.ca.gov | Arnel Vega | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-5 of 5 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-06-18-21 | 06/18/2019 | 08/08/2019 | Per Request | Soil | View |
2019-06-18-20 | 06/18/2019 | 08/08/2019 | Per Request | Soil | View |
2019-06-18-19 | 06/18/2019 | 08/08/2019 | Per Request | Soil | View |
2019-06-18-18 | 06/18/2019 | 08/08/2019 | Per Request | Soil | View |
2019-06-18-17 | 06/18/2019 | 08/08/2019 | Per Request | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods