Project Details
This page displays current information for project DEA: 081G2104.
Project Information
Project Identifiers | Project ID: 214315 DEA: 081G2104 EFIS: 0815000170 |
---|---|
DIST-CO-RTE-PM | 08-SBD-210 - 15,210-7.4/9.0, 10.5/12.7 |
Award Date | 10/01/2019 |
Closeout Date | 09/15/2021 |
Work Description | Install lighting and ramp metering systems. |
Location Description | Not set |
QA Service Level | 1 (Verified on 12/10/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
lawrance.yaacoub@dot.ca.gov | Lawrance Yaacoub | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-03-11-7 | 03/11/2020 | 03/16/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-08-19-3 | 08/19/2020 | 08/20/2020 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods