Project Details
This page displays current information for project DEA: 060Q9004.
Project Information
Project Identifiers | Project ID: 214292 DEA: 060Q9004 EFIS: 0614000047 |
---|---|
DIST-CO-RTE-PM | 06-FRE-180-92.2,130.1 |
Award Date | 12/13/2019 |
Closeout Date | 10/29/2020 |
Work Description | REPLACE BRIDGE RAILS. |
Location Description | FRESNO COUNTY NEAR SQUAW VALLEY AT MILL CREEK BRIDGE AND NEAR BOYDEN CAVE AT SOUTH FORK KINGS RIVER BRIDGE |
QA Service Level | 1 (Verified on 08/05/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
donald.hiura@dot.ca.gov | Donald Hiura | Resident Engineer | Caltrans RE DB |
nathan.quiroz@dot.ca.gov | Nathan Quiroz | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 41-42 of 42 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-07-22-45 | 07/22/2020 | 07/23/2020 | Quality Control | Concrete | View |
2020-07-24-40 | 07/24/2020 | 07/25/2020 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods