Project Details
This page displays current information for project DEA: 044Q0304.
Project Information
Project Identifiers | Project ID: 214283 DEA: 044Q0304 EFIS: 0419000306 |
---|---|
DIST-CO-RTE-PM | 04-SON-1-11.2, 11.20 |
Award Date | 05/01/2019 |
Closeout Date | 06/20/2022 |
Work Description | REPLACE FAILED 60" CMP CULVERT WITH 10'x10' PRECAST REINFORCED CONCRETE BOX |
Location Description | Not set |
QA Service Level | 1 (Verified on 08/19/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jonathan.chi@dot.ca.gov | Jonathan Chi | Resident Engineer | Caltrans RE DB |
jonathan.chi@dot.ca.gov | Jonathan Chi | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 12 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-08-28-14 | 08/28/2019 | 08/30/2019 | Quality Assurance | Concrete | View |
2019-08-28-12 | 08/28/2019 | 08/30/2019 | Quality Assurance | Concrete | View |
2019-08-28-11 | 08/28/2019 | 08/30/2019 | Quality Assurance | Concrete | View |
2019-08-28-10 | 08/28/2019 | 08/30/2019 | Quality Assurance | Concrete | View |
2019-08-28-9 | 08/28/2019 | 08/30/2019 | Quality Assurance | Concrete | View |
2019-08-20-8 | 08/20/2019 | 08/22/2019 | Quality Assurance | SMTL TM5 - Couplers | View |
2019-08-20-7 | 08/20/2019 | 08/22/2019 | Quality Assurance | Concrete | View |
2019-08-20-6 | 08/20/2019 | 08/22/2019 | Quality Assurance | Concrete | View |
2019-08-20-5 | 08/20/2019 | 08/22/2019 | Quality Assurance | Concrete | View |
2019-08-20-2 | 08/20/2019 | 08/22/2019 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods