Project Details

This page displays current information for project DEA: 06484604.

Project Information

Project IdentifiersProject ID: 214261
DEA: 06484604
EFIS: 0600000484
COOP: 061726
DIST-CO-RTE-PM06--,99-
Award DateNot set
Closeout DateNot set
Work DescriptionThe bridge work includes construction of ten (10) new bridges as part of the future SR-58 Centennial Corridor. This work includes constructing one (1) Viaduct, four (4) Undercrossings, three (3) Overcrossings, and two (2) Connector Overcrossings. In addit
Location Descriptionn Kern County in Bakersfield on Route 58 from 0.1 miles west of Mohawk St to Cottonwood Rd and on Route 99 from 0.8 miles south of Route 58 to 0.3 Miles north of Route 58
QA Service Level2 (Verified on 08/05/2019)

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs submitted for this project.
Declaration NumberProgram OperatorMaterial TypeVendorSubmitted by
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods