Project Details
This page displays current information for project DEA: 06484604.
Project Information
Project Identifiers | Project ID: 214261 DEA: 06484604 EFIS: 0600000484 COOP: 061726 |
---|---|
DIST-CO-RTE-PM | 06--,99- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | The bridge work includes construction of ten (10) new bridges as part of the future SR-58 Centennial Corridor. This work includes constructing one (1) Viaduct, four (4) Undercrossings, three (3) Overcrossings, and two (2) Connector Overcrossings. In addit |
Location Description | n Kern County in Bakersfield on Route 58 from 0.1 miles west of Mohawk St to Cottonwood Rd and on Route 99 from 0.8 miles south of Route 58 to 0.3 Miles north of Route 58 |
QA Service Level | 2 (Verified on 08/05/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Travis.S.Landas@dot.ca.gov | Travis Landas | Resident Engineer | Caltrans RE DB |
arturo.infante@va-incorp.com | Art Infante (Also SMR) | Oversight Resident Engineer | Caltrans REO DB |
husam.mohdankir@aecom.com | Husam mohdankir | Oversight Structural Representative | Caltrans SRO DB |
jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 27 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-07-19-17 | 07/19/2023 | 07/19/2023 | Department Acceptance | Roadway/Bridge Surface | View |
2023-09-14-41 | 09/14/2023 | 09/14/2023 | Department Acceptance | Roadway/Bridge Surface | View |
2023-10-31-59 | 10/31/2023 | 10/31/2023 | Department Acceptance | Roadway/Bridge Surface | View |
2023-10-31-60 | 10/31/2023 | 10/31/2023 | Department Acceptance | Roadway/Bridge Surface | View |
2023-10-31-61 | 10/31/2023 | 10/31/2023 | Department Acceptance | Roadway/Bridge Surface | View |
2023-10-31-62 | 10/31/2023 | 10/31/2023 | Department Acceptance | Roadway/Bridge Surface | View |
2023-11-02-29 | 11/02/2023 | 11/02/2023 | Department Acceptance | Roadway/Bridge Surface | View |
2023-11-02-30 | 11/02/2023 | 11/02/2023 | Department Acceptance | Roadway/Bridge Surface | View |
2023-11-02-31 | 11/02/2023 | 11/02/2023 | Department Acceptance | Roadway/Bridge Surface | View |
2023-11-13-48 | 11/13/2023 | 11/13/2023 | Department Acceptance | Roadway/Bridge Surface | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |