Project Details
This page displays current information for project DEA: 120N4904.
Project Information
Project Identifiers | Project ID: 214228 DEA: 120N4904 EFIS: 1214000050 |
---|---|
DIST-CO-RTE-PM | 12-ORA-91-R12.5/R13.9 |
Award Date | 11/29/2022 |
Closeout Date | 11/07/2023 |
Work Description | VEHICLE ENFORCEMENT FACILITY IMPROVEMENT AT PERALTA WEIGH STATION. |
Location Description | ORANGE COUNTY IN ANAHEIM FROM 1.0 MILE EAST OF ROUTE 91/90 SEPARATION TO 0.5 MILE WEST OF WEIR CANYON ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 08/13/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
dat.pham@dot.ca.gov | Dat Pham | Resident Engineer | Caltrans RE DB |
bijan.ronagh-langroodi@dot.ca.gov | Bijan Ronagh-Langroodi | Structural Representative | Caltrans SR DB |
danny.chung@dot.ca.gov | Danny Chung | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 20 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-09-14-10 | 09/14/2020 | 09/24/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-09-14-11 | 09/14/2020 | 09/24/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-09-14-12 | 09/14/2020 | 09/18/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-09-23-10 | 09/23/2020 | 09/28/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-09-23-11 | 09/23/2020 | 09/28/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-09-23-12 | 09/23/2020 | 09/28/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-09-23-13 | 09/23/2020 | 09/28/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-09-23-14 | 09/23/2020 | 09/28/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-09-23-15 | 09/23/2020 | 09/28/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-10-26-1 | 10/26/2020 | 11/02/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods