Project Details
This page displays current information for project DEA: 071XM404.
Project Information
Project Identifiers | Project ID: 214216 DEA: 071XM404 EFIS: 0719000232 |
---|---|
DIST-CO-RTE-PM | 07-VEN-33-22.16, 22.16 |
Award Date | 06/21/2019 |
Closeout Date | 10/06/2022 |
Work Description | This is the emergency project to repair pavement cracking, stabilize the eroded slope, construct a soldier pile tieback wall and reconstruct the steel post MGS |
Location Description | Ventura County on Route 33 at PM.22.16. |
QA Service Level | 1 (Verified on 08/27/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Alan.Davis@dot.ca.gov | Alan Davis | Resident Engineer | Caltrans RE DB |
amaghsoudloo@prescienceusa.com | Aziz Maghsoudloo | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-02-18-5 | 02/18/2022 | 02/18/2022 | Department Acceptance | Soil | View |
2022-02-18-4 | 02/18/2022 | 02/18/2022 | Department Acceptance | Soil | View |
2021-06-25-5 | 06/25/2021 | 06/29/2021 | Verification | Aggregate | View |
2021-05-25-6 | 05/25/2021 | 05/27/2021 | Verification | Aggregate | View |
2020-08-05-1 | 08/05/2020 | 08/07/2020 | Department Acceptance | SMTL TM5 - Threaded Bar | View |
2020-06-30-4 | 06/30/2020 | 07/09/2020 | Department Acceptance | SMTL TM5 - Threaded Bar | View |
2019-11-18-5 | 11/18/2019 | 11/20/2019 | Quality Assurance | Soil | View |
2019-11-18-4 | 11/18/2019 | 11/20/2019 | Quality Assurance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods