Project Details
This page displays current information for project DEA: 081H3404.
Project Information
Project Identifiers | Project ID: 214157 DEA: 081H3404 EFIS: 0817000016 |
---|---|
DIST-CO-RTE-PM | 08-SBD-210,215-21.1/R26.3,4.1/14.3 |
Award Date | 06/19/2019 |
Closeout Date | 09/02/2020 |
Work Description | PRECAST SLAB AND CURB RAMP REPLACEMENT AND PLACE RHMA-G. |
Location Description | SAN BERNARDINO COUNTY ON ROUTE 210 FROM 0.6 MILE EAST OF STATE STREET TO STERLING AVENUE AND ON ROUTE 215 FROM PALM STREET TO ROUTE 10/215 SEPARATION |
QA Service Level | 1 (Verified on 11/04/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
samer.georges@dot.ca.gov | Samer Georges | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-10-19-22 | 10/19/2019 | 10/20/2019 | Department Acceptance | Concrete | View |
2019-11-23-14 | 11/23/2019 | 11/27/2019 | Verification | Aggregate | View |
2019-11-25-34 | 11/25/2019 | 11/27/2019 | Department Acceptance | Hot Mix Asphalt | View |
2019-11-26-18 | 11/26/2019 | 11/28/2019 | Department Acceptance | Aggregate | View |
2019-11-25-38 | 11/25/2019 | 12/02/2019 | Quality Assurance | Hot Mix Asphalt | View |
2019-11-26-10 | 11/26/2019 | 12/03/2019 | Department Acceptance | Hot Mix Asphalt | View |
2019-11-26-15 | 11/26/2019 | 12/05/2019 | Quality Assurance | Hot Mix Asphalt | View |
2019-11-23-22 | 11/23/2019 | 12/11/2019 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods