Project Details
This page displays current information for project DEA: 081J1204.
Project Information
Project Identifiers | Project ID: 214141 DEA: 081J1204 EFIS: 0817000208 |
---|---|
DIST-CO-RTE-PM | 08-RIV-15,91,215-Var |
Award Date | 06/13/2019 |
Closeout Date | 02/07/2020 |
Work Description | REMOVE, PREPARE AND FURNISH POLYESTER CONCRETE OVERLAY. |
Location Description | RIVERSIDE COUNTY AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 08/23/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-10-31-14 | 10/31/2019 | 11/14/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-10-31-2 | 10/31/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View | |
2019-08-21-15 | 08/21/2019 | 08/21/2019 | Quality Control | Methacrylate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods