Project Details

This page displays current information for project DEA: 080N69U4.

Project Information

Project IdentifiersProject ID: 214131
DEA: 080N69U4
EFIS: 0812000307
COOP: 081635
DIST-CO-RTE-PM08-RIV-60-22.1/22.6
Award Date05/01/2019
Closeout DateNot set
Work DescriptionImproving Operation efficiency and traffic flow in the SR-60 Truck Corridor in Moreno Valley. Widening inside and outside shoulders in 6 stages.
Location DescriptionR-60 Truck Climbing Lane . Construction of new east and west bound truck lanes from Gilman Springs road to 1.37 miles west if Jack Rabbit trail. Existing shoulders will be widened to standard 10 ft inside and 12 ft outside respectively.
QA Service Level2 (Verified on 04/30/2019)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
jennifer.olarte@dot.ca.govJennifer OlarteMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-6 of 6 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2019-08-08-2708/08/201908/19/2019VerificationAggregateView
2019-10-10-1810/10/201910/29/2019VerificationAggregateView
2020-05-26-505/26/202005/27/2020VerificationAggregateView
2020-06-03-306/03/202006/08/2020VerificationAggregateView
2021-05-21-2805/21/202106/22/2021VerificationAggregateView
2021-06-23-2706/23/202107/12/2021VerificationAggregateView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods