Project Details

This page displays current information for project DEA: 040A5394.

Project Information

Project IdentifiersProject ID: 214114
DEA: 040A5394
EFIS: 0418000244
DIST-CO-RTE-PM04-SOL-80,12-11.4/12.8, 2.1/2.8
Award DateNot set
Closeout Date02/24/2023
Work DescriptionWiden EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc.
Location DescriptionI-80/I-680/Route 12 Interchange
QA Service Level1 (Verified on 04/23/2019)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
cassaundra.lograsso@dot.ca.govCassaundra LograssoResident EngineerCaltrans RE DB

Samples

Samples submitted for this project.

Displaying 101-110 of 253 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2021-08-26-2008/26/202108/27/2021Quality AssuranceConcreteView
2021-08-25-1308/25/202108/27/2021Quality AssuranceConcreteView
2021-08-23-1308/23/202108/27/2021Quality AssuranceConcreteView
2021-08-20-4408/20/202108/20/2021VerificationAggregateView
2021-08-20-4508/20/202108/20/2021VerificationHot Mix AsphaltView
2021-08-20-4608/20/202108/20/2021VerificationReclaimed Asphalt PavementView
2021-08-20-4708/20/202109/27/2021VerificationReclaimed Asphalt PavementView
2021-08-20-5308/20/202108/20/2021VerificationAggregateView
2021-08-20-5408/20/202108/20/2021VerificationReclaimed Asphalt PavementView
2021-08-20-5508/20/202108/20/2021VerificationHot Mix AsphaltView

Job Mix Formula (JMF)

JMFs associated with this project.

Displaying 1-3 of 3 results.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
JMF3511-318-2021-99Submittal Accepted for Verification CT D04 - Hayward DME / District Laboratory10/06/2021View
JMF3511-318-2021-98Submittal Accepted for Verification CT D04 - Hayward DME / District Laboratory09/22/2021View
JMF3511-318-2021-96Submittal Accepted for Verification CT D04 - Hayward DME / District Laboratory09/15/2021View

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods