Project Details
This page displays current information for project DEA: 024F5904.
Project Information
Project Identifiers | Project ID: 214099 DEA: 024F5904 EFIS: 0213000010 |
---|---|
DIST-CO-RTE-PM | 02-TEH-5-R25.4 |
Award Date | 07/08/2020 |
Closeout Date | 08/14/2023 |
Work Description | BRIDGE SEISMIC RETROFIT AND SCOUR REPAIR. |
Location Description | TEHAMA COUNTY IN RED BLUFF AT SACRAMENTO RIVER BRIDGE |
QA Service Level | 1 (Verified on 05/07/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mike.zdenek@dot.ca.gov | Mike Z'denek | Resident Engineer | Caltrans RE DB |
ryan.duran@dot.ca.gov | Ryan Duran | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 31 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-11-11-11 | 11/11/2021 | 11/18/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-11-30-13 | 11/30/2021 | 12/13/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2022-03-22-1 | 03/22/2022 | 03/30/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2022-03-22-2 | 03/22/2022 | 03/30/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2022-03-21-6 | 03/21/2022 | 04/06/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2022-03-21-7 | 03/21/2022 | 04/06/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2022-03-21-8 | 03/21/2022 | 04/06/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2022-03-21-9 | 03/21/2022 | 04/06/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2022-03-21-10 | 03/21/2022 | 04/06/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2022-04-11-1 | 04/11/2022 | 04/11/2022 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods