Project Details
This page displays current information for project DEA: 101C5304.
Project Information
Project Identifiers | Project ID: 214077 DEA: 101C5304 EFIS: 1015000002 |
---|---|
DIST-CO-RTE-PM | 10-STA,SJ-5,99-Var |
Award Date | 05/24/2019 |
Closeout Date | 04/26/2021 |
Work Description | OVERHEAD AND ROADSIDE SIGNS, AND MODIFY ELECTRICAL SYSTEMS. |
Location Description | SAN JOAQUIN AND STANISLAUS COUNTIES AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 04/11/2019) |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-12-11-1 | 12/11/2019 | 12/18/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-12-11-3 | 12/11/2019 | 12/18/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-12-11-4 | 12/11/2019 | 12/18/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-12-11-5 | 12/11/2019 | 12/18/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-12-11-6 | 12/11/2019 | 12/18/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-12-11-7 | 12/11/2019 | 12/18/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-12-11-8 | 12/11/2019 | 12/18/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-10-07-11 | 10/07/2019 | 10/16/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted by | DIME Sample ID | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs submitted for this project.
Declaration Number | Program Operator | Material Type | Vendor | Submitted by |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods