Project Details
This page displays current information for project DEA: 07301104.
Project Information
Project Identifiers | Project ID: 214029 DEA: 07301104 EFIS: 0714000009 |
---|---|
DIST-CO-RTE-PM | 07-LA-60,710-710-R2.8/11.8, 24.1/25.1 |
Award Date | 06/03/2019 |
Closeout Date | 10/17/2023 |
Work Description | Roadway ex, place jointed plain concrete pavement & concrete barrieres |
Location Description | In Los Angeles County at avocado Heights on Route 60 from 0.5 Mile west of Route 60/710 Separation to Route 60/605 Separation AND on Route 710 from 0.5 miles south of Route 710/60 Separation to 0.5 mile north of Route 710/60 Separation. |
QA Service Level | 1 (Verified on 06/25/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Sepand.Minovi@dot.ca.gov | Sepand Minovi | Resident Engineer | Caltrans RE DB |
rjensen@prescienceusa.com | Rick Jensen | Structural Representative | Caltrans SR DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 32 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-03-04-4 | 03/04/2021 | 03/08/2021 | Verification | Aggregate | View |
2021-03-31-9 | 03/31/2021 | 04/02/2021 | Verification | Aggregate | View |
2020-12-09-1 | 12/09/2020 | 12/09/2020 | Stock | SMTL TM3 - Fastener Assembly | View |
2020-12-09-2 | 12/09/2020 | 12/09/2020 | Stock | SMTL TM3 - Fastener Assembly | View |
2020-05-17-1 | 05/17/2020 | 05/19/2020 | Quality Assurance | Concrete | View |
2020-08-21-22 | 08/21/2020 | 08/28/2020 | Quality Assurance | Concrete | View |
2020-10-18-12 | 10/18/2020 | 10/20/2020 | Quality Assurance | Concrete | View |
2020-12-15-2 | 12/15/2020 | 12/15/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-12-15-3 | 12/15/2020 | 12/15/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-01-12-1 | 01/12/2021 | 01/14/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods