Project IdentifiersProject ID: 214029
DEA: 07301104
EFIS: 0714000009
DIST-CO-RTE-PM07-LA-60,710-710-R2.8/11.8, 24.1/25.1
Award Date06/03/2019
Closeout Date10/17/2023
Work DescriptionRoadway ex, place jointed plain concrete pavement & concrete barrieres
Location DescriptionIn Los Angeles County at avocado Heights on Route 60 from 0.5 Mile west of Route 60/710 Separation to Route 60/605 Separation AND on Route 710 from 0.5 miles south of Route 710/60 Separation to 0.5 mile north of Route 710/60 Separation.
QA Service Level1 (Verified on 06/25/2019)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
Sepand.Minovi@dot.ca.govSepand MinoviResident EngineerCaltrans RE DB
rjensen@prescienceusa.comRick JensenStructural RepresentativeCaltrans SR DB
jeffrey.yu@dot.ca.govJeffrey YuMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 32 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2020-10-03-1610/03/202010/03/2020Quality AssuranceConcreteView
2021-03-06-703/06/202103/06/2021Quality AssuranceConcreteView
2021-03-31-903/31/202104/02/2021VerificationAggregateView
2021-03-04-403/04/202103/08/2021VerificationAggregateView
2021-02-23-102/23/202102/23/2021VerificationAggregateView
2021-01-13-2801/13/202101/25/2021Department AcceptanceHot Mix AsphaltView
2021-01-14-2201/14/202101/25/2021Department AcceptanceHot Mix AsphaltView
2021-01-12-901/12/202101/14/2021VerificationAggregateView
2021-01-12-301/12/202101/14/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-01-12-201/12/202101/14/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods