Project Details
This page displays current information for project DEA: 034H9504.
Project Information
Project Identifiers | Project ID: 214015 DEA: 034H9504 EFIS: 0319000123 |
---|---|
DIST-CO-RTE-PM | 03-SAC,SAC/YOL-12,160-0-0.4/26.3-26.4, Var, various |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Repair and modernize electromechanical bridge. |
Location Description | In Sacramento County at four bridges. |
QA Service Level | 1 (Verified on 03/12/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
masoud.saed@dot.ca.gov | Masoud Saed | Resident Engineer | Caltrans RE DB |
rusty.danna@dot.ca.gov | Rusty D'Anna | Structural Representative | Caltrans SR DB |
donald.adams@dot.ca.gov | Donald Adams | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-17 of 17 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-06-05-10 | 06/05/2020 | 06/08/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-06-05-11 | 06/05/2020 | 06/08/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-11-13-11 | 11/13/2019 | 11/19/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-11-13-36 | 11/13/2019 | 11/15/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-11-07-3 | 11/07/2019 | Verification | SMTL TM3 - Fastener Assembly | View | |
2019-11-07-4 | 11/07/2019 | 11/08/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2019-11-01-10 | 11/01/2019 | 11/06/2019 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods