Project Details
This page displays current information for project DEA: 100T9104.
Project Information
Project Identifiers | Project ID: 213959 DEA: 100T9104 EFIS: 1000000306 COOP: 10345,10446 |
---|---|
DIST-CO-RTE-PM | 10-STA-99-R4.1/F4.9 |
Award Date | 08/29/2018 |
Closeout Date | 07/23/2021 |
Work Description | Roadway reconstruction, including roadway and ramp widening and new traffic signals. The work also include retaining walls, ground anchor walls, detention basins, HMA paving, storm drain, and drainage basins. First day: 4/29/19, Completion: 6/2/20 |
Location Description | State Highway 99 in Stanislaus County In the City of Turlock from 0.4 mile south to 0.4 mile north of Fulkerth Road Undercrossing. |
QA Service Level | 2 (Verified on 02/21/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
obaidullah.rashid@dot.ca.gov | Abdul Rashid | Resident Engineer | Caltrans RE DB |
Joy.Denny@nv5.com | Joy Denny | Oversight Resident Engineer | Caltrans REO DB |
kelvin.low@dot.ca.gov | Kelvin Low | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods