Project Details
This page displays current information for project DEA: 043G4544.
Project Information
Project Identifiers | Project ID: 213903 DEA: 043G4544 EFIS: 0412000054 |
---|---|
DIST-CO-RTE-PM | 04-ALA,SM-92-R14.4/R18.8,R0.0/R.2.4 |
Award Date | 12/31/2019 |
Closeout Date | 04/04/2025 |
Work Description | Repair Spalled Concrete Columns and Spandrel Beams |
Location Description | San Mateo-Hayward Bridge |
QA Service Level | 1 (Verified on 01/22/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
kingston.atako@dot.ca.gov | Kingston Atako | Resident Engineer | Caltrans RE DB |
lisa.chang@dot.ca.gov | Lisa Chang-Bridges | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-18 of 18 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-04-18-10 | 04/18/2023 | 04/20/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-04-18-9 | 04/18/2023 | 04/20/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-04-18-8 | 04/18/2023 | 04/20/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-02-09-40 | 02/09/2021 | 02/10/2021 | Quality Assurance | Rapid Set | View |
2021-03-05-26 | 03/05/2021 | 03/08/2021 | Quality Assurance | Rapid Set | View |
2021-02-09-35 | 02/09/2021 | 02/22/2021 | Per Request | Aggregate | View |
2020-10-02-18 | 10/02/2020 | 10/08/2020 | Quality Assurance | Concrete | View |
2020-10-02-17 | 10/02/2020 | 10/08/2020 | Quality Assurance | Concrete | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods