Project Details
This page displays current information for project DEA: 112888U4.
Project Information
Project Identifiers | Project ID: 213856 DEA: 112888U4 EFIS: 1118000199 |
---|---|
DIST-CO-RTE-PM | 11-SD-11,125,905-Various |
Award Date | 05/09/2019 |
Closeout Date | 09/14/2023 |
Work Description | CONSTRUCT FREEWAY TO FREEWAY CONNECTORS AND 4-LANE HIGHWAY FACILITY |
Location Description | SAN DIEGO COUNTY AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 07/19/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
carlos.covarrubias@dot.ca.gov | Carlos Covarrubias | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 52 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-01-27-18 | 01/27/2020 | 01/31/2020 | Quality Control | SMTL TM5 - Headed Bars | View |
2020-04-30-21 | 04/30/2020 | 05/05/2020 | Verification | Concrete | View |
2020-05-15-1 | 05/15/2020 | 05/22/2020 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2020-05-15-2 | 05/15/2020 | 05/22/2020 | Quality Control | SMTL TM5 - Headed Bars | View |
2020-05-28-1 | 05/28/2020 | 06/03/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-05-28-2 | 05/28/2020 | 06/03/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-05-29-4 | 05/29/2020 | 06/04/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2020-05-29-5 | 05/29/2020 | 06/04/2020 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2020-07-09-2 | 07/09/2020 | 07/17/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-08-31-4 | 08/31/2020 | 09/01/2020 | Quality Assurance | SMTL TM5 - Couplers | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods