This page displays current information for project DEA: 080N6704.
Project Information
Project Identifiers | Project ID: 213808 DEA: 080N6704 EFIS: 0800000536 |
---|---|
DIST-CO-RTE-PM | 08-RIV-74-28.1/37.4 |
Award Date | 03/12/2019 |
Closeout Date | 04/28/2022 |
Work Description | CONSTRUCT RAISED MEDIAN AND LEFT TURN LANES. |
Location Description | RIVERSIDE COUNTY NEAR HEMET FROM 0.6 MILE EAST OF ROUTE 215 TO 0.4 MILE WEST OF ACACIA AVENUE. |
QA Service Level | 1 (Verified on 12/04/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
nick.truong@dot.ca.gov | Nick Truong | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 24 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-03-26-16 | 03/26/2021 | 03/29/2021 | Department Acceptance | Hot Mix Asphalt | View |
2021-03-24-5 | 03/24/2021 | 03/25/2021 | Verification | Aggregate | View |
2020-09-11-7 | 09/11/2020 | 09/11/2020 | Verification | Aggregate | View |
2020-09-09-8 | 09/09/2020 | 09/10/2020 | Verification | Aggregate | View |
2020-07-13-23 | 07/13/2020 | 07/10/2020 | Department Acceptance | Hot Mix Asphalt | View |
2020-07-10-18 | 07/10/2020 | 07/13/2020 | Department Acceptance | Hot Mix Asphalt | View |
2020-07-08-18 | 07/08/2020 | 07/10/2020 | Department Acceptance | Hot Mix Asphalt | View |
2020-06-17-31 | 06/17/2020 | 06/18/2020 | Department Acceptance | Hot Mix Asphalt | View |
2020-06-15-6 | 06/15/2020 | 06/16/2020 | Verification | Aggregate | View |
2020-06-02-14 | 06/02/2020 | 06/03/2020 | Department Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods