Project Details
This page displays current information for project DEA: 080F0304.
Project Information
Project Identifiers | Project ID: 213764 DEA: 080F0304 EFIS: 0800020358 |
---|---|
DIST-CO-RTE-PM | 08-SBD-60-R0.7/R3.0 |
Award Date | 03/07/2019 |
Closeout Date | 07/27/2023 |
Work Description | REMOVE AND REPLACE THREE OVERCROSSING BRIDGES ON ROUTE 60 |
Location Description | IN SAN BERNARDINO COUNTY IN AND NEAR CHINO AT VARIOUS LOCATIONS FROM O.1 MILE WEST OF PIPELINE AVENUE OVERCROSSING TO 0.1 MILE EAST OF BENSON AVENUE OVERCROSSING |
QA Service Level | 1 (Verified on 05/01/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
joseph.lopez@dot.ca.gov | Joseph Lopez | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 102 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-10-19-14 | 10/19/2020 | 11/09/2020 | Quality Assurance | Concrete | View |
2020-10-18-15 | 10/18/2020 | 11/23/2020 | Quality Assurance | Concrete | View |
2020-10-15-20 | 10/15/2020 | 11/09/2020 | Quality Assurance | Concrete | View |
2020-10-15-19 | 10/15/2020 | 11/09/2020 | Quality Assurance | Concrete | View |
2020-10-07-17 | 10/07/2020 | 10/09/2020 | Quality Assurance | Concrete | View |
2020-10-02-24 | 10/02/2020 | 10/09/2020 | Quality Assurance | Concrete | View |
2020-09-14-29 | 09/14/2020 | 09/21/2020 | Quality Assurance | Concrete | View |
2020-09-11-20 | 09/11/2020 | 09/21/2020 | Quality Assurance | Concrete | View |
2020-08-12-17 | 08/12/2020 | 08/13/2020 | Quality Assurance | Hot Mix Asphalt | View |
2020-08-12-5 | 08/12/2020 | 08/13/2020 | Verification | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods