Project Details
This page displays current information for project DEA: 120K0224.
Project Information
Project Identifiers | Project ID: 213750 DEA: 120K0224 EFIS: 1214000097 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5-14.5/17.1 |
Award Date | 03/05/2019 |
Closeout Date | Not set |
Work Description | South County Improvement Project (Phase 2 - Oso/Alicia) CONST BRIDGES, RW, SW, HMA PVMT, JPCP, DRAINAGE, AND ELECT SYSTEMS. |
Location Description | ORANGE COUNTY IN MISSION VIEJO AND LAGUNA HILLS FROM 0.7 MILE SOUTH OF OSO PARKWAY OVERCROSSING TO 0.3 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING |
QA Service Level | 1 (Verified on 04/15/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
steven.kim@dot.ca.gov | Steven Kim | Resident Engineer | Caltrans RE DB |
sara.soleimani@dot.ca.gov | Sara Soleimani | Structural Representative | Caltrans SR DB |
keivan.hassan@dot.ca.gov | Keivan Hassan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 71-80 of 128 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-10-22-1 | 10/22/2021 | 10/25/2021 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2021-10-14-47 | 10/14/2021 | 10/25/2021 | Quality Assurance | SMTL TM5 - Couplers | View |
2021-10-14-48 | 10/14/2021 | 10/25/2021 | Quality Assurance | SMTL TM5 - Couplers | View |
2021-10-12-4 | 10/12/2021 | 10/20/2021 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2021-09-22-3 | 09/22/2021 | 09/29/2021 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2021-09-22-4 | 09/22/2021 | 09/22/2021 | Quality Control | SMTL TM5 - Headed Bars | View |
2021-08-20-35 | 08/20/2021 | 09/02/2021 | Quality Assurance | SMTL TM6 - Ductile Iron Cast Samples | View |
2021-08-06-19 | 08/06/2021 | 08/12/2021 | Quality Assurance | SMTL TM5 - Couplers | View |
2021-06-09-26 | 06/09/2021 | 06/24/2021 | Verification | Aggregate | View |
2021-06-14-3 | 06/14/2021 | 06/15/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods