Project Details
This page displays current information for project DEA: 120C1104.
Project Information
Project Identifiers | Project ID: 213749 DEA: 120C1104 EFIS: 1200000633 |
---|---|
DIST-CO-RTE-PM | 12-ORA-57-20.3/21.6 |
Award Date | 04/19/2019 |
Closeout Date | 05/28/2024 |
Work Description | SR-57 Lambert Interchange Project: WIDEN BRIDGES AND CONSTRUCT RW, SW, HMA, JPCP AND ELECTRICAL SYSTEMS. |
Location Description | ORANGE COUNTY IN BREA FROM 0.6 MILE SOUTH TO 0.7 MILE NORTH OF LAMBERT ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 05/31/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Steven.Kim@dot.ca.gov | Steven Kim | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 40 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-10-19-13 | 10/19/2022 | 10/19/2022 | Quality Assurance | Concrete | View |
2023-06-06-66 | 06/06/2023 | 06/06/2023 | Quality Assurance | Concrete | View |
2023-07-03-21 | 07/03/2023 | 07/06/2023 | Quality Assurance | SMTL TM6 - Ductile Iron Cast Samples | View |
2023-07-19-31 | 07/19/2023 | 07/20/2023 | Quality Assurance | Concrete | View |
2023-08-07-5 | 08/07/2023 | 08/03/2023 | Production Start-Up | Hot Mix Asphalt | View |
2023-08-03-51 | 08/03/2023 | 08/07/2023 | Verification | Aggregate | View |
2023-08-03-71 | 08/03/2023 | 08/07/2023 | Production Start-Up | Asphalt Binder | View |
2023-08-01-20 | 08/01/2023 | 08/08/2023 | Per Request | Cementitious | View |
2023-08-04-40 | 08/04/2023 | 08/08/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-10-14-24 | 10/14/2023 | 10/17/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods