Project Details
This page displays current information for project DEA: 080Q75U4.
Project Information
Project Identifiers | Project ID: 213746 DEA: 080Q75U4 EFIS: 0817000114 |
---|---|
DIST-CO-RTE-PM | 08-SBD,RIV-60-R4.6/R9.9, R0.0/12.2 |
Award Date | 04/18/2019 |
Closeout Date | 06/28/2022 |
Work Description | REPLACEMENT OF TWO OUTSIDE LANES AND CONCRETE SLABS |
Location Description | Not set |
QA Service Level | 1 (Verified on 06/17/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mujahid.qureshi@dot.ca.gov | Mujahid Qureshi | Resident Engineer | Caltrans RE DB |
ching.chuang@dot.ca.gov | Ching Chuang | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 961-966 of 966 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-06-19-21 | 06/19/2019 | 06/20/2019 | Per Request | Soil | View |
2019-06-19-22 | 06/19/2019 | 06/20/2019 | Per Request | Soil | View |
2019-06-19-23 | 06/19/2019 | 06/20/2019 | Per Request | Soil | View |
2019-06-13-16 | 06/13/2019 | 07/10/2019 | Verification | Aggregate | View |
2019-06-13-17 | 06/13/2019 | 07/03/2019 | Verification | Aggregate | View |
2019-06-06-9 | 06/06/2019 | 06/10/2019 | Verification | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods