Project Details
This page displays current information for project DEA: 080Q75U4.
Project Information
Project Identifiers | Project ID: 213746 DEA: 080Q75U4 EFIS: 0817000114 |
---|---|
DIST-CO-RTE-PM | 08-SBD,RIV-60-R4.6/R9.9, R0.0/12.2 |
Award Date | 04/18/2019 |
Closeout Date | 06/28/2022 |
Work Description | REPLACEMENT OF TWO OUTSIDE LANES AND CONCRETE SLABS |
Location Description | Not set |
QA Service Level | 1 (Verified on 06/17/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mujahid.qureshi@dot.ca.gov | Mujahid Qureshi | Resident Engineer | Caltrans RE DB |
ching.chuang@dot.ca.gov | Ching Chuang | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 91-100 of 966 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-01-25-1 | 01/25/2020 | 01/27/2020 | Quality Assurance | Concrete | View |
2020-02-19-6 | 02/19/2020 | 02/21/2020 | Quality Assurance | Concrete | View |
2020-02-19-7 | 02/19/2020 | 02/25/2020 | Quality Assurance | Concrete | View |
2020-02-20-9 | 02/20/2020 | 02/25/2020 | Quality Assurance | Concrete | View |
2020-02-20-10 | 02/20/2020 | 02/25/2020 | Quality Assurance | Concrete | View |
2020-03-02-4 | 03/02/2020 | 03/04/2020 | Quality Assurance | Concrete | View |
2020-03-03-18 | 03/03/2020 | 03/04/2020 | Quality Assurance | Concrete | View |
2020-03-03-19 | 03/03/2020 | 03/04/2020 | Quality Assurance | Concrete | View |
2020-03-07-1 | 03/07/2020 | 03/09/2020 | Quality Assurance | Concrete | View |
2020-03-07-2 | 03/07/2020 | 03/09/2020 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods