Project Details
This page displays current information for project DEA: 080P3904.
Project Information
Project Identifiers | Project ID: 213744 DEA: 080P3904 EFIS: 0800001025 |
---|---|
DIST-CO-RTE-PM | 08-SBD-18-101.5/115.9 |
Award Date | 02/01/2019 |
Closeout Date | 08/16/2023 |
Work Description | WIDEN EXISTING SHOULDER TO 8' AND CONSTRUCT SHOULDER RUMBLE STRIPS |
Location Description | SAN BERNARDINO COUNTY FROM 0.5 MILE WEST OF ROUTE 395 TO 263 RD STREET. |
QA Service Level | 1 (Verified on 05/30/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
john.santos@dot.ca.gov | John Santos | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 42 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2019-09-10-13 | 09/10/2019 | 09/11/2019 | Acceptance | Hot Mix Asphalt | View |
2019-09-11-12 | 09/11/2019 | 09/11/2019 | Acceptance | Hot Mix Asphalt | View |
2019-09-12-8 | 09/12/2019 | 09/16/2019 | Acceptance | Hot Mix Asphalt | View |
2019-09-16-8 | 09/16/2019 | 09/17/2019 | Acceptance | Hot Mix Asphalt | View |
2019-09-17-10 | 09/17/2019 | 09/20/2019 | Acceptance | Hot Mix Asphalt | View |
2019-09-18-9 | 09/18/2019 | 09/20/2019 | Acceptance | Hot Mix Asphalt | View |
2019-09-19-11 | 09/19/2019 | 09/20/2019 | Acceptance | Hot Mix Asphalt | View |
2019-09-23-14 | 09/23/2019 | 09/24/2019 | Acceptance | Hot Mix Asphalt | View |
2019-09-20-15 | 09/20/2019 | 09/23/2019 | Acceptance | Hot Mix Asphalt | View |
2019-09-24-24 | 09/24/2019 | 09/26/2019 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods