Project Details
This page displays current information for project DEA: 07325704.
Project Information
Project Identifiers | Project ID: 213741 DEA: 07325704 EFIS: 0716000089 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-1.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | BUILDING CONSTRUCTION IN LOS ANGELES COUNTY IN SANTA FE SPRINGS AT 14044 FREEWAY DRIVE. |
Location Description | Santa Fe Springs, At 14044 Freeway Drive. |
QA Service Level | 1 (Verified on 07/08/2019) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mashhur.ali@dot.ca.gov | Mashhur Ali | Resident Engineer | Caltrans RE DB |
nelson.parada@dot.ca.gov | Nelson Parada | Structural Representative | Caltrans SR DB |
julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 43 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-09-14-4 | 09/14/2020 | 09/18/2020 | Retest | SMTL TM3 - Fastener Assembly | View |
2020-10-07-1 | 10/07/2020 | 10/12/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-11-09-18 | 11/09/2020 | 11/13/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-11-09-19 | 11/09/2020 | 11/13/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-11-09-20 | 11/09/2020 | 11/13/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-11-09-21 | 11/09/2020 | 11/13/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2020-11-09-22 | 11/09/2020 | 11/13/2020 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-02-09-13 | 02/09/2021 | 02/15/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-02-09-14 | 02/09/2021 | 02/15/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-02-09-17 | 02/09/2021 | 02/15/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods